Building over a sewer without approval risks both the asset and the structure — and can block future maintenance access. Authorities assess each application, often requiring CCTV condition surveys of the affected main before and after construction, protective design measures, or pipe relocation.
Pre- and post-construction CCTV reports are a standard requirement in these applications, documenting that the works did not damage the main.